Dover-Sherborn High Middle School
Client: Dover-Sherborn Public Schools
Project Location: Dover, Massachusetts
Project Size: 78,000 SF
Project Type: Roof Restoration
Scope:
The existing SBS modified bitumen roof system at the Dover-Sherborn Middle School and the Lindquist Commons Building was experiencing deterioration that included blistering, stressed and cracked membrane, wrinkles, and tenting which resulted in areas of wet insulation.
Services:
Prepared design and construction documents and oversaw the roof restoration
Conducted infrared roof survey to identify areas of wet insulation which were removed and replaced with dry materials.
Prepared existing roof membrane so that it could successfully receive the new fluid applied roof coating system
Installed LiquiTec by The Garland Company, a zero VOC, two-component fluid applied roofing restoration system with a 20-year warranty, which was placed over the existing roof to cost effectively restore and extend the life of the roof as opposed to a full roof replacement
By restoring the roof, it was also estimated that approximately 60,000 pounds of construction debris were prevented from entering a landfill