Scope:

The existing SBS modified bitumen roof system at the Dover-Sherborn Middle School and the Lindquist Commons Building was experiencing deterioration that included blistering, stressed and cracked membrane, wrinkles, and tenting which resulted in areas of wet insulation.

Services:

  • Prepared design and construction documents and oversaw the roof restoration

  • Conducted infrared roof survey to identify areas of wet insulation which were removed and replaced with dry materials. 

  • Prepared existing roof membrane so that it could successfully receive the new fluid applied roof coating system

  • Installed LiquiTec by The Garland Company, a zero VOC, two-component fluid applied roofing restoration system with a 20-year warranty, which was placed over the existing roof to cost effectively restore and extend the life of the roof as opposed to a full roof replacement

  • By restoring the roof, it was also estimated that approximately 60,000 pounds of construction debris were prevented from entering a landfill