Scope:
Newly constructed three-story building requiring window testing during construction to ensure that windows were installed properly and are without air leakage and water infiltration.
Services:
Window testing included a stand-alone mock-up as well as an in-building mock-up. Window testing were in accordance with the following standards:
ASTM E783: Standard Test Method for Field Measurement of Air Leakage Through Installed Exterior Windows and Doors