Manchester Memorial Elementary School

Client: John Turner Consulting
Project Location:
Manchester-by-the-Sea, Massachusetts
Project Type:
Window Testing and AVB Testing

Scope:

As part of a larger renovation and addition construction project, a new air and vapor barrier system was installed, which required testing to ensure that it was executed properly and met all required building standards. This process was an essential step to guarantee the integrity and efficiency of the new system.

Services:

Air infiltration testing conducted in accordance with

  • ASTM E1186: Standard Practices for Air Leakage Site Detection in Building Envelopes and Air Barrier Systems

  • ASTM D4541: Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers