Ware Middle School
Client: Kapiloff’s Glass, Inc.
Project Location: Ware, Massachusetts
Project Type: Air Infiltration and Water Testing
Scope:
Ware Middle School underwent a renovation that included the installation of new store fronts, curtain walls, and energy-efficient windows. To ensure proper installation of these components, thorough testing was conducted to guarantee that everything met the necessary standards.
Services:
Air infiltration and water penetration tests in accordance with the following:
ASTM: E 783: Field Measurement of Air Through Installed Exterior Windows and Doors.
ASTM: E 1105: Field Determination of Water Penetration of Installed Exterior Windows, Curtain Walls, and Doors by Cyclic Static Air Pressure Difference